STUDY ON OPTIMAL PUMPING DESIGN FOR DEWATERING IN EXCAVATION SITE

Bibliographic Information

Other Title
  • 地盤掘削工事における最適化手法を用いた排水設計方法に関する考察
  • ジバン クッサク コウジ ニ オケル サイテキカ シュホウ オ モチイタ ハイ

Search this article

Abstract

An optimal design method is presented for dewatering a excavation site. It predicts the optimum number of deep wells, their locations, and the rate of pumping needed to maintain ground water levels below specified elevations at steady and unsteady state. In our proposed method a linear programming method is used to determine the pumping rate at steady state and AIC is used to suggest the optimum deep well locations. This is accomplished by including the finite element analysis of two-dimensional steady seepage flow. Nonlinear least-squares algorithm incorporating finite element analysis of unsteady seepage flow is used to compute the pumping rate required to reach ground water levels below appointed elevation in a prescribed time. The method is applied to several examples of dewatering for a large excavation site in unconfined aquifer models.

Journal

Citations (2)*help

See more

References(8)*help

See more

Details 詳細情報について

Report a problem

Back to top