荒瀬ダム撤去後の堆積土砂の流出・堆積状況

書誌事項

タイトル別名
  • SEDIMENT EROSION AND DEPOSITION IN THE FORMER ARASE DAM RESERVOIR UNDER THE DAM REMOVAL PROJECT
  • アラセ ダム テッキョ ゴ ノ タイセキ ドシャ ノ リュウシュツ ・ タイセキ ジョウキョウ

この論文をさがす

抄録

 The Arase Dam on the Kumagawa River in Kumamoto Pref., Japan, has been subsumed under removal project as the first high-dam removal in Japan. In March 2015, the dam crest on the right side has been removed with the first flushing and continuity of flow and sediment has been restored. In this study, we conducted elevation measurement with RTK-GNSS and SfM analysis using UAV aerial photo set. As a result of our investigation, we found significant scouring in the upper stream of the dam site caused by several times of floods (Qmax=2000-3000 m3/sec). According to our estimation, 1.5 * 105 m3 of the sediment on former reservoir (26% of total) are washed to the downstream and 1.8 * 105 m3 was found on the immediate downstream of the dam site and it created new sand bar.

収録刊行物

被引用文献 (1)*注記

もっと見る

参考文献 (2)*注記

もっと見る

関連プロジェクト

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ