破砕泥岩不良地山における高剛性、高強度支保構造によるII期線近接情報化施工

DOI

書誌事項

タイトル別名
  • OBSERVATIONAL CLOSE CONSTRUCTION OF PHASE TWO TUNNEL WITH SUPPORT OF HIGH RIGIDITY AND HIGH STRENGTH FOR FRACTURE ZONE OF MUDSTONE

抄録

In Phase II tunnel construction, it is required in the first place that the safety of Phase I tunnel which is used in public should be secured. Especially, when the influence of Phase II tunnel construction is expected from the result of Phase I tunnel construction, the measure for safety reservation of Phase I tunnel is needed. In the Mt. Taro Phase II tunnel construction, the support immediately invert-closed of high rigidity and high strength was adopted in the fracture zone and the effectiveness of the support for reducing the displacement of Phase I tunnel by Phase II tunnel construction was proved. This report shows the results of measurement and the importance of an observed construction.

収録刊行物

詳細情報 詳細情報について

  • CRID
    1390282680376755456
  • NII論文ID
    130004386941
  • DOI
    10.11532/journalte1991.12.309
  • ISSN
    18849091
  • データソース種別
    • JaLC
    • CiNii Articles
  • 抄録ライセンスフラグ
    使用不可

問題の指摘

ページトップへ