IMPROVEMENT ON MECHANICAL EXECUTION FOR INCLINED SHAFTS
-
- KANEKO Yoshiyuki
- 電源開発 (株) 奥清津第二建設所カッサ工区
Bibliographic Information
- Other Title
-
- 機械化施工による斜坑掘削の改善について
Description
Okukiyotsu No.2 Hydro Power Plant is designed as a pumped storage power plant with an effective head of 470m, maximum working water flow 154m3/s, and maximum output 600MW. The penstock is divided into the upper stage portion of excavation with diameter 6.60m, extension about 400m, and gradient 5ldegrees; and the lower with diameter 5.30m, extension about 260m, and gradient 51degrees. For the upper stage portion, a pilot shaft of 2.7m×2.7m was excavated with an Alimak Climber. For the lower, the raise drilling method was adopted. The pilot hole diameter was 270mm and the reaming hole diameter was 1470mm.
Journal
-
- PROCEEDINGS OF TUNNEL ENGINEERING, JSCE
-
PROCEEDINGS OF TUNNEL ENGINEERING, JSCE 5 261-266, 1995
Japan Society of Civil Engineers
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390282680378469376
-
- NII Article ID
- 130004387270
-
- ISSN
- 18849091
-
- Data Source
-
- JaLC
- CiNii Articles
-
- Abstract License Flag
- Disallowed