New Constructing Method developed and adopted for the Tohoku Joetsu Shinkansen

Bibliographic Information

Other Title
  • 東北・上越新幹線のコンクリート構造物における新技術

Abstract

It took 11 years to complete the Tohoku & Joetsu Shinkansen Line, because of oil pannic and another social surroundings. This paper reports about design considerations and construction methods of track system, foundation and concrete beam, considering the high speed running in the cold and heavy snow environments, constructing method of long span bridge, energy saved constructing method of middle span bridge, and rapid constructing method etc..

Journal

  • Concrete Journal

    Concrete Journal 21 (11), 35-48, 1983

    Japan Concrete Institute