- 【Updated on May 12, 2025】 Integration of CiNii Dissertations and CiNii Books into CiNii Research
- Trial version of CiNii Research Automatic Translation feature is available on CiNii Labs
- Suspension and deletion of data provided by Nikkei BP
- Regarding the recording of “Research Data” and “Evidence Data”
The Present Situation of Precast Concrete Permanent Formwork
-
- Nakane S.
- (株) 大林組技術研究所建築第二研究室
-
- Koyanagi M.
- (株) 大林組技術研究所建築第二研究室
-
- Iriya K.
- (株) 大林組土木技術本部技術課
Bibliographic Information
- Other Title
-
- プレキャスト (PCa) 型枠工法の現状
Search this article
Description
PCa permanent formworks are practically used for the purpose of labor-saving and time shortening. The half PCa permanent formworks of slabs and walls have been widely used, and recently thin PCa formworks are increasing in the field of architectures. In the field of civil structures the PCa permanent formworks of high durability not only for labor-saving are used.
Journal
-
- Concrete Journal
-
Concrete Journal 33 (4), 25-34, 1995
Japan Concrete Institute
- Tweet
Details 詳細情報について
-
- CRID
- 1390282680432906112
-
- NII Article ID
- 130004398652
-
- ISSN
- 03871061
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- Crossref
- CiNii Articles
-
- Abstract License Flag
- Disallowed