Stand Structure of ‘Ecological Tree Planting’ Site within a Industrial Open Space at Bay Shore on the eighteenth Year after Planting

Bibliographic Information

Other Title
  • 湾岸工場地での「エコロジー緑化」植栽地における施工18年目の林分構造
  • 湾岸工場地での「エオロジー緑化」植栽地における施工18年目の林分構造
  • ワンガン コウジョウチ デ ノ エオロジー リョッカ ショクサイチ ニ オケル
  • Stand structure of ‘ecological tree planting’ site within a industrial open space at bay shore on eighteenth year after planting

Search this article

Abstract

In order to explicate the formation of the stand structure of 'ecological tree planting' site, we investigated the conditions of the stand in a bay shore power station at Himeji city on the eighteenth year after planting. Vegetation of the upper layer were mainly composed of Machilus thunbergii, Lithocarpus edulis and Ligusturm lucidum. Many seedlings of Rhaphiolepis umbllata and Ligusturm lucidum grew on the stratum on the ground surface. The formation of some vegetation layers was recognized, which was caused by gap formation. The soil stratum within carbon and nitrogen extended to deeper layer from the planting time. Furthermore, those formation was emphasized by the recognition of some species of cicadas with the cast-off shells and forester insects. However, the floristic composition in the stand was different from that of Photinia glabra-Castanopsis cuspidata association, a natural vegetation around the investigated area.

Journal

Citations (13)*help

See more

References(8)*help

See more

Details 詳細情報について

Report a problem

Back to top