- 【Updated on May 12, 2025】 Integration of CiNii Dissertations and CiNii Books into CiNii Research
- Trial version of CiNii Research Automatic Translation feature is available on CiNii Labs
- Suspension and deletion of data provided by Nikkei BP
- Regarding the recording of “Research Data” and “Evidence Data”
Mixed-Model Assembly Line Scheduling in Consideration of Idle Time and Line Stops.
Bibliographic Information
- Other Title
-
- 遊休時間とラインの停止を考慮した混合組立ラインのスケジューリング
- ユウキュウ ジカン ト ライン ノ テイシ オ コウリョ シタ コンゴウ クミタテ ライン ノ スケジューリング
Search this article
Description
In mixed-model assembly line problem in JIT production system, to keep the consumption rate of each part is very important. It is called parts usage leveling goal. The goal chasing method (GC) and a number of paper have been proposed to achieve this goal. Recently, the time-based goal chasing method (TBGC) that is consideration of the different assembly time among each product has been proposed. The good point of TBGC is able to consider the working situation at assembly line. However, TBGC has been only applied to simple assembly line problem. In the assembly line, line stops do not happen because working area is not restricted and total length of the line is assumed to be long enough. In this paper, working situations are formulated in order to apply TBGC to an aessembly line problem which has line stops.
Journal
-
- TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C
-
TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C 67 (653), 262-269, 2001
The Japan Society of Mechanical Engineers
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390282681304752128
-
- NII Article ID
- 110002386000
- 130004233911
-
- NII Book ID
- AN00187463
-
- ISSN
- 18848354
- 03875024
-
- NDL BIB ID
- 5652501
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- NDL Search
- Crossref
- CiNii Articles
- OpenAIRE
-
- Abstract License Flag
- Disallowed