Maximize Profit in Two-Stage Flow Shop Scheduling.
Bibliographic Information
- Other Title
-
- 2工程フローショップ・モデルにおける利益最大化スケジューリング
- 2 コウテイ フロー ショップ モデル ニ オケル リエキ サイダイカ スケジューリング
Search this article
Abstract
This paper presents a scheduling method to maximize total profit as a performance measure in a two-stage flow shop model. The profit is defined as the difference between the revenue and the cost of production, and a scheduling method to maximize total profit is proposed using the Branch and Bound method aiming at maximizing revenue and minimizing costs. This paper compares the optimal schedule which maximize total profit with the optimal schedule which minimize total flow time searched by Johnson's theory. This paper also shows the usefulness and some characteristics of the proposed method through various numerical experiments.
Journal
-
- TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C
-
TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C 68 (672), 2502-2509, 2002
The Japan Society of Mechanical Engineers
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390282681332978816
-
- NII Article ID
- 130004234434
- 110002378646
-
- NII Book ID
- AN00187463
-
- ISSN
- 18848354
- 03875024
-
- NDL BIB ID
- 6275207
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- Abstract License Flag
- Disallowed