A consideration on evaluation of the Hokuriku Shinkansen

DOI

Bibliographic Information

Other Title
  • 北陸新幹線の評価に関する一考察

Abstract

<p>On March 14, 2015, the Hokuriku Shinkansen line started its operation between Nagano and Kanazawa Station. It came to connect Tokyo to Kanazawa in Ishikawa Prefecture in about 2 hours and 30 minutes. Moreover, it was renamed the “Hokuriku Shinkansen” at this time. The approach from the metropolitan area to “Toyama prefecture,” whose charm is nature including Tateyama and Kurobe, and “Ishikawa prefecture,” whose capital Kanazawa is popular for its history and tradition of Kaga-hyakumangoku was greatly improved. In this study, what evaluations the Hokuriku Shinkansen has received by its users for these three years were investigated using online reviews. </p>

Journal

Details 詳細情報について

  • CRID
    1390286981380958080
  • NII Article ID
    130007979957
  • DOI
    10.24466/pacbfsa.31.0_124
  • ISSN
    24242586
    13451510
  • Text Lang
    ja
  • Data Source
    • JaLC
    • CiNii Articles
  • Abstract License Flag
    Disallowed

Report a problem

Back to top