Estimation Method of Disconnection Point Using Common Earthing Conductor for Distribution Line with Branch Line

  • Kodama Yasuhiro
    Advanced Collaborative Research Organization for Smart Society Research Institute for Advanced Network Technology R&D Planning and Strategy Group R&D Management Office, TEPCO Research Institute, Tokyo Electric Power Company Holdings, Inc.
  • Hayashi Yasuhiro
    Advanced Collaborative Research Organization for Smart Society Research Institute for Advanced Network Technology
  • Nishida Yusuke
    R&D Planning and Strategy Group R&D Management Office, TEPCO Research Institute, Tokyo Electric Power Company Holdings, Inc.

Bibliographic Information

Other Title
  • 分岐線を有する配電線の共同接地線を用いた断線点推定手法
  • ブンキセン オ ユウスル ハイデンセン ノ キョウドウ セッチセン オ モチイタ ダンセンテン スイテイ シュホウ

Search this article

Abstract

<p>We investigate the method of the branch point estimation using the common earthing conductor, when disconnection occurs at the trunk line and branch line of the distribution line with the branch line. The disconnection detection method using common earthing conductor estimates disconnection point from the time difference of the zero-crossing point of the current flowing at the rising of each common earthing conductor in connected the end point of two adjacent distribution lines. When the branch line of the distribution line is broken, the relationship between the time difference between the zero crossing points and the disconnection distance of the current caused by the wire returning to the feed point of the two common earthing lines is shown, and the cause of the time difference at the zero-crossing point is clarified. In addition, the operating conditions for application to actual equipment will be examined and the results will be shown.</p>

Journal

References(1)*help

See more

Details 詳細情報について

Report a problem

Back to top