ケーブルの取替を前提とした斜張橋の初期コスト削減に関する研究

書誌事項

タイトル別名
  • A Study on Initial Cost Reduction of Cable-Stayed Bridges by Considering the Replacement of Cables
  • ケーブル ノ トリカエ オ ゼンテイ ト シタ シャチョウキョウ ノ ショキ コスト サクゲン ニ カンスル ケンキュウ

この論文をさがす

抄録

A series of this study were conducted during 2005 and 2006 by the sponsorships of FUT Research Promotion Fund. In past 2005, surveys concerning the replacements of cable of cable-stayed bridges and the corresponding basic analytical methods of cable-stayed bridges by considering the replacements of cables were executed numerically. In this year 2006, the possibility of initial cost reductions of cable-stayed bridges were evaluated and estimated by a lot of numerical calculations.

収録刊行物

詳細情報 詳細情報について

問題の指摘

ページトップへ