An Analysis of Cost Factors for the Optimal Operation Planning in Kanban System : The Optimal Operation Planning of Kanban in Toyota Production System (Part II)
-
- YANAGAWA Yoshinari
- University of Osaka Prefecture
-
- MIYAZAKI Shigeji
- University of Osaka Prefecture
-
- OHTA Hiroshi
- University of Osaka Prefecture
Bibliographic Information
- Other Title
-
- かんばん方式の費用構造分析と最適運用法 : トヨタ生産システムにおけるかんばん方式の最適運用法(第2法)
Description
In Part I the optimal order interval of the fixed interval withdrawal Kanban system has been given to minimize the total operating cost. In this paper the cost function compoesed of inventory cost, order cost, and container soct for the supplier Kanban system including the inventory at the preceding station is analyzed. The optimal operation planning of the supplier Kanban is given in terms of two decision variables-the order interval and the container capacity-on the basis of field data in a factory ; the behaviours of optimal order interval and container capacity are investigated under various values of parameters.
Journal
-
- Journal of Japan Industrial Management Association
-
Journal of Japan Industrial Management Association 40 (3), 141-148, 1989-08-15
Japan Industrial Management Association
- Tweet
Details 詳細情報について
-
- CRID
- 1390564238054488448
-
- NII Article ID
- 110003935028
-
- ISSN
- 24329983
- 03864812
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- CiNii Articles
-
- Abstract License Flag
- Disallowed