An Optimization for Ore Blending Schedules Using Mathematical Programming Methods

  • Kumano Akira
    Cyber - Physical System R & D Department, Steel Research Laboratory, JFE Steel Corporation
  • Yoshinari Yusuke
    Cyber - Physical System R & D Department, Steel Research Laboratory, JFE Steel Corporation
  • Yamaguchi Osamu
    Cyber - Physical System R & D Department, Steel Research Laboratory, JFE Steel Corporation
  • Miyazawa Toru
    Iron Making Process Department, West Japan Works(Fukuyama), JFE Steel Corporation

Bibliographic Information

Other Title
  • 数理最適化技術を用いた鉱石配合計画の最適化
  • スウリ サイテキカ ギジュツ オ モチイタ コウセキ ハイゴウ ケイカク ノ サイテキカ

Search this article

Description

<p>We have developed an optimal scheduling method for raw material operations aiming the raw materials cost reduction. In this paper, we report optimization approaches to minimize the cost of ore blending in steel works.</p><p>The ore blending problem is to make schedules for the purpose of cost minimization under several constraints such as the stock in yards, ingredients in sintered ore. When formulating as a mathematical model, nonlinearity exists in this problem and make it complicated. However, this problem has characteristic that becomes a linear problem by fixing several key variables as constants. To overcome the nonlinearity, we developed our original Hybrid model that was a combination of Particle Swarm Optimization (PSO) and Linear Programming method (LP). We applied PSO to search the best way of fixing key variables, and obtained blending schedules by solving LPs. Our Hybrid model searched wide area effectively, and derived the solution within 2 minutes. Numerical experiments indicated a cost reduction of secondary materials by 1%.</p>

Journal

  • Tetsu-to-Hagane

    Tetsu-to-Hagane 106 (9), 611-620, 2020

    The Iron and Steel Institute of Japan

Citations (1)*help

See more

References(4)*help

See more

Details 詳細情報について

Report a problem

Back to top