Development of Hydrogen Mixing Pipe for New FCV by Using Two-phase Flow Simulation

Bibliographic Information

Other Title
  • 二相流シミュレーションを用いた新型FCV 向け水素合流配管の開発

Description

In the 2020 fuel cell stack, the hydrogen supply piping has been simplified with the aim of reducing costs and mounting space. A hydrogen mixing pipe was newly installed to eliminate the insufficient mixing of supplied hydrogen and circulating hydrogen caused by this simplification. A two-phase flow simulation was used to design a hydrogen mixing pipe that can both prevent the inflow of circulating water into the fuel cell and mix hydrogen.

Journal

Details 詳細情報について

  • CRID
    1390570543474463872
  • NII Article ID
    130008074906
  • DOI
    10.11351/jsaeronbun.52.973
  • ISSN
    18830811
    02878321
  • Text Lang
    ja
  • Data Source
    • JaLC
    • CiNii Articles
  • Abstract License Flag
    Disallowed

Report a problem

Back to top