コンクリート三面張り河川における河川生物の生息場所再生に関する技術検討

書誌事項

タイトル別名
  • Approach the method of habitat restoration for Macroinvertebrates on Fixed River covered with Concrete

説明

<p>Although there were lots of papers about setting spur dikes, none of them clear the characteristics about sediment transportation and deformation of river bed around spur dikes on the Fixed Bed. In this study, investigation of Ikejiri River, which had been set up spur dikes three years ago, and flume experiments were conducted in order to consider the suitable methods of setting spur dikes in restoration for Macroinvertebrates. The comparison of the experimental results, we could indicate three key points about construction: 1) They aren’t attracted sediment transportation well between spur dikes, so it’s better to set sediment there artificially 2) The submerged spur dikes should be set up three and more continuously, 3) The only first interval between spur dikes should be narrows.</p>

収録刊行物

詳細情報 詳細情報について

  • CRID
    1390577078292576768
  • DOI
    10.11532/river.17.0_503
  • ISSN
    24366714
  • 本文言語コード
    ja
  • データソース種別
    • JaLC
  • 抄録ライセンスフラグ
    使用可

問題の指摘

ページトップへ