Sequencing Method for Various-assembly-timed Products in a Single Work Station : Mixed-model Assembly Scheduling Problem in JIT Production System : Part I

Bibliographic Information

Other Title
  • 単一組立工程における異なる組立時間をもつ製品の投入順序決定法 : JIT生産方式における多品種の組立スケジューリング(第一報)
  • 単一組立工程における異なる組立時間をもつ製品の投入順序決定法--JIT生産方式における多品種の組立スケジューリング(第1報)
  • タンイツ クミタテ コウテイ ニ オケル コトナル クミタテ ジカン オ モツ

Search this article

Abstract

This paper, taking the difference of assembly time of each product into account, proposes a new heuristic method based on the goal chasing method for sequencing various-assembly-time products in a single work station. In addition, the effect of neglecting the difference of assembly time of each product is discussed through comparing a number of results obtained by the goal chasing method and our proposed method. A large number of better results show the effectiveness of our proposed method.

Journal

Citations (4)*help

See more

References(6)*help

See more

Details 詳細情報について

Report a problem

Back to top