Modeling Cascade Hydropower Dams and Its Optimized Operation during Floods

Bibliographic Information

Other Title
  • カスケード発電ダム群のモデル化と洪水時操作の最適化の検討
  • カスケード ハツデン ダムグン ノ モデルカ ト コウズイジ ソウサ ノ サイテキカ ノ ケントウ

Search this article

Description

<p>In Japan, there is increasing demand of improvement of reservoir operation system. In the case of cascaded hydropower dams, using them for controlling flood is considered, but due to data lacking or conflict of interest, discussion hasn’t been developed. In this study, cascade model of hydropower dams and proposal of preliminary discharging method was made. As a result, 70 million yen of energy loss can be reduced in one flood on average, and flood controlling was effective if cooperate operation and preliminary operation are properly combined.</p>

Journal

Details 詳細情報について

Report a problem

Back to top