QUESTIONNAIRE SURVEYS ON THE ACTUAL CONDITIONS OF PLACING BOOMS WORK IN CONCRETE PUMPING METHOD

Bibliographic Information

Other Title
  • コンクリートポンプ工法におけるブーム先端ホース作業の実態に関するアンケート調査

Search this article

Abstract

<p>In this report, we conducted a questionnaire for pumping constructors to clarify the actual condition of work with placing booms. As a result, although JIS A 8612 limits the accessories that can be connected to placing booms tip depending on the shape of placing booms tip, it was suggested that the actual work depends on the construction conditions and the quality of pumped concrete than the shape of placing booms tip. In addition, equipment that exceeds JIS A 8612 limits has be often connected, which was particularly noticeable for concrete pump with long placing booms.</p>

Journal

References(2)*help

See more

Details 詳細情報について

Report a problem

Back to top