この論文をさがす
説明
In this paper, we studied a planning and scheduling of production system considering demand changes. In the proposed system, planning part determines lot-size and amount of jobs in production. On the other hand, scheduling part determines the production sequence of jobs. In order to treat with the demand changes, both planning and scheduling should work well simultaneously. In the proposed system, preset and real time production control system is newly constructed from the view point of adaptive control. In the system, production planning is modified when the difference between production amount and demand becomes large. Moreover, production schedule is regenerated when the determined schedule is deviated from the prospected one. The scheduling system is characterized as the autonomous decentralized optimization system where each job works as agent and agent searches its appropriate starting time of processing. The effectiveness of the proposed system is confirmed by numerical examples.
収録刊行物
-
- Memoirs of the Faculty of Engineering, Okayama University
-
Memoirs of the Faculty of Engineering, Okayama University 36 (2), 15-42, 2002-03
Faculty of Engineering, Okayama University
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1390853649752962944
-
- NII論文ID
- 80015471209
-
- NII書誌ID
- AA10699856
-
- ISSN
- 04750071
-
- DOI
- 10.18926/47023
-
- 本文言語コード
- en
-
- データソース種別
-
- JaLC
- IRDB
- CiNii Articles