Optimal Generation Schedule in Micro-Grids Considering the Possible Damage by Uncertainties of Forecasts

DOI HANDLE オープンアクセス
  • 張 鵬
    九州大学大学院システム情報科学府電気電子工学専攻 : 大学院生
  • 高野 浩貴
    九州大学大学院システム情報科学研究院電気システム工学部門
  • 村田 純一
    九州大学大学院システム情報科学研究院電気システム工学部門
  • 飯坂 達也
    富士電機(株)技術開発本部
  • 中西 要祐
    富士電機(株)技術開発本部

この論文をさがす

抄録

The optimal generation schedule of controllable generators is necessary considering both the supply-demand balancing and the economy of generation. The conventional methods minimize the operation cost with a constraint to guarantee that the operating generators can readily change their outputs to meet the demand variation. Installation of nature-affected generations such as wind turbines and photovoltaic generation makes it harder for operating generators to compensate the variation, because their forecasts contain significant errors. In this research, the damage caused by possible supply-demand imbalance arising from the large uncertainties of forecasts is evaluated by penalty which represents the necessary additional cost to fix the imbalance. Due to the random nature of the forecast errors, the penalty is evaluated as an expectation. The optimal generation schedule is obtained by minimizing the summation of expectation of penalty and the operation cost. The simulation results indicate that the proposed method can achieve the generation schedule with less total cost than the conventional methods.

収録刊行物

詳細情報 詳細情報について

  • CRID
    1390853649768287616
  • NII論文ID
    120005306728
  • NII書誌ID
    AN10569524
  • DOI
    10.15017/26857
  • ISSN
    21880891
    13423819
  • HANDLE
    2324/26857
  • 本文言語コード
    en
  • データソース種別
    • JaLC
    • IRDB
    • CiNii Articles
  • 抄録ライセンスフラグ
    使用可

問題の指摘

ページトップへ