Behavior and Evaluation of Dredged Clay Sedimentary Layers with PVD Installed during Subsequent Discharging of Dredged Clay

  • KATAGIRI Masaaki
    Urban and Civil Project Department, Civil Engineering Group, Nikken Sekkei
  • YAMAZAKI Seiya
    Urban and Civil Project Department, Civil Engineering Group, Nikken Sekkei
  • KATO Ryosuke
    Urban and Civil Project Department, Civil Engineering Group, Nikken Sekkei
  • MORI Haruo
    Coastal Development Institute of Technology
  • NISHIKURA Takahiro
    Coastal Development Institute of Technology
  • KITAHARA Masahiro
    Kyushu Regional Construction Bureau, Ministry of Land, Infrastructure, Transport and Tourism
  • KIYOYAMA Takatoshi
    Kyushu Regional Construction Bureau, Ministry of Land, Infrastructure, Transport and Tourism
  • MATSUO Takeshi
    Kyushu Regional Construction Bureau, Ministry of Land, Infrastructure, Transport and Tourism

Bibliographic Information

Other Title
  • PVDを打設した浚渫粘土堆積層のその後の浚渫粘土投入中の挙動と評価

Abstract

<p>As a measure to increase the acceptance capacity of disposal pond for dredged clay in operation, the accelerated consolidation method, in which PVD is installed vertically, was adopted in Shinmoji-oki disposal pond. In this study, the issues of setting up the geotechnical model at the time of PVD installation and the effective period of PVD itself were focused. The validity of the method using the reclamation analysis with monitoring results proposed as a method to solve these problems and the effective period of the PVD itself were examined.</p>