The Processing of Post-Earthquake/Tsunami Disaster Waste in the Watari Area of Miyagi Prefecture

  • Endo Yoshinori
    Watari Waste Treatment J.V Construction Office (OBAYASHI Corporation etc.)

Bibliographic Information

Other Title
  • 亘理処理区における災害廃棄物処理について
  • ワタリ ショリク ニ オケル サイガイ ハイキブツ ショリ ニ ツイテ

Search this article

Abstract

In its wake, the Great East Japan Earthquake that hit on 11 March 2012 left 536,000 tons of post-disaster debris and 500,000 m3 of tsunami sediment in the town of Watari in Japan′s Miyagi Prefecture. Based on government policy stating that all waste is required to be disposed of within three years of the disaster, waste disposal servicing here must be completed by the end of March, 2014. In addition, landfill volumes must be kept to a minimum. This further requires special recycling service throughout the disposal process. This report gives an overview of the disposal flow and disaster waste separation treatment facilities that have been implemented to bring about successful improvements from the design stage to the disposal stage.

Journal

Details 詳細情報について

Report a problem

Back to top