The operational results of 17GHz TWT for Broadcasting Satellite feederlink system

  • SASAKI Tsuyoshi
    Central Television Transmitting Station Engineering Administration Department Japan Broadcasting Corporation
  • OKANIWA Tomohiko
    Central Television Transmitting Station Engineering Administration Department Japan Broadcasting Corporation
  • FURUHATA Toshio
    Central Television Transmitting Station Engineering Administration Department Japan Broadcasting Corporation

Bibliographic Information

Other Title
  • 放送衛星フィーダーリンク用17GHz帯TWT運用実績

Search this article

Description

17GHz band has been used for the feederlink to the Broadcasting Satellite (BSAT-1)as the first operational use in Japan since August, 1997, and the equipment for the new frequency band was introduced. The various phenomena of TWT experienced during the operation of the early phase were analyzed, the causes of those were identified, and the several inprovements were adapted. Also the current stable operational status after these TWT inprovements and the study results for more stable operation are presented in this paper.

Journal

  • IEICE technical report. EMD

    IEICE technical report. EMD 98 (613), 53-59, 1999-02-19

    The Institute of Electronics, Information and Communication Engineers

Citations (2)*help

See more

References(7)*help

See more

Details 詳細情報について

  • CRID
    1573668927130313472
  • NII Article ID
    110003293583
  • NII Book ID
    AN10383978
  • Text Lang
    ja
  • Data Source
    • CiNii Articles

Report a problem

Back to top