The operational results of 17GHz TWT for Broadcasting Satellite feederlink system
-
- SASAKI Tsuyoshi
- Central Television Transmitting Station Engineering Administration Department Japan Broadcasting Corporation
-
- OKANIWA Tomohiko
- Central Television Transmitting Station Engineering Administration Department Japan Broadcasting Corporation
-
- FURUHATA Toshio
- Central Television Transmitting Station Engineering Administration Department Japan Broadcasting Corporation
Bibliographic Information
- Other Title
-
- 放送衛星フィーダーリンク用17GHz帯TWT運用実績
Search this article
Description
17GHz band has been used for the feederlink to the Broadcasting Satellite (BSAT-1)as the first operational use in Japan since August, 1997, and the equipment for the new frequency band was introduced. The various phenomena of TWT experienced during the operation of the early phase were analyzed, the causes of those were identified, and the several inprovements were adapted. Also the current stable operational status after these TWT inprovements and the study results for more stable operation are presented in this paper.
Journal
-
- IEICE technical report. EMD
-
IEICE technical report. EMD 98 (613), 53-59, 1999-02-19
The Institute of Electronics, Information and Communication Engineers
- Tweet
Details 詳細情報について
-
- CRID
- 1573668927130313472
-
- NII Article ID
- 110003293583
-
- NII Book ID
- AN10383978
-
- Text Lang
- ja
-
- Data Source
-
- CiNii Articles