FACTORS IDENTIFICATION ON OPTIMIZATION OF BALL PLACEMENT TOOL FOR FLIP-CHIP-BALL-GRID-ARRAY PRODUCT

DOI オープンアクセス

この論文をさがす

説明

<jats:p>Market demand on system-on-chip (SoC) using ball-attach technologies, it is time for ball-attach module to have an improvement on their capabilities within limited resources (man and machine). This paper identifies caused of factor which contributes more time to production time. Justification on improving ball-attach module cycle time during high volume activities is explained.</jats:p>

収録刊行物

キーワード

詳細情報 詳細情報について

  • CRID
    1871428067730518912
  • DOI
    10.11113/jt.v78.4278
  • ISSN
    21803722
    01279696
  • データソース種別
    • OpenAIRE

問題の指摘

ページトップへ