FACTORS IDENTIFICATION ON OPTIMIZATION OF BALL PLACEMENT TOOL FOR FLIP-CHIP-BALL-GRID-ARRAY PRODUCT
この論文をさがす
説明
<jats:p>Market demand on system-on-chip (SoC) using ball-attach technologies, it is time for ball-attach module to have an improvement on their capabilities within limited resources (man and machine). This paper identifies caused of factor which contributes more time to production time. Justification on improving ball-attach module cycle time during high volume activities is explained.</jats:p>
収録刊行物
-
- Jurnal Teknologi
-
Jurnal Teknologi 78 2015-12-22
Penerbit UTM Press
- Tweet
キーワード
詳細情報 詳細情報について
-
- CRID
- 1871428067730518912
-
- ISSN
- 21803722
- 01279696
-
- データソース種別
-
- OpenAIRE