Evaluating changes in radionuclide concentrations and groundwater levels before and after the cooling pond drawdown in the Chornobyl Nuclear Power Plant vicinity
この論文をさがす
説明
In the vicinity of the Chornobyl Nuclear Power Plant (ChNPP), the cooling pond (CP) was an artificially maintained reservoir with water levels regulated to 7 m above the Pripyat River until May 2014, when its pumps stopped operating, resulting in a natural drawdown. To investigate the surface-groundwater system before and after the drawdown, we evaluated the spatial and temporal changes in
収録刊行物
-
- Science of The Total Environment
-
Science of The Total Environment 872 161997-, 2023-05
Elsevier BV