抄録

It is one of the most important problem for tunnel construction to estimate the final amount of rock deformation.<BR>This paper deals with the estimation of the final amount from the amount of deformation in the earlier stage of measurements at Dai-Sau-Shirasaka Tunnel which is under construction with the New Austrian Tunnelling Method.<BR>We have distinctly found that the rock behavior after excavation is constituted with viscous and plasticelastic deformations in adopting new measurement method described in this paper.<BR>Rock deformation U can be expressed by the following equations, <BR>U=UV+UEP<BR>UV=a·t<BR>UEP=C (1-e-D. L)<BR>where, UV: viscous deformation<BR>UEP: plastic elastic deformation<BR>t: elapsed time after blasting<BR>L: distance between the observation point and tunnel face<BR>a, C, D: constants

収録刊行物

  • 応用地質

    応用地質 20 (3), 97-104, 1979

    一般社団法人 日本応用地質学会

キーワード

詳細情報 詳細情報について

問題の指摘

ページトップへ