Lime Kiln Capacity Upgrade and Optimizing Its Operation

Bibliographic Information

Other Title
  • キルン焼成能力増強工事とその操業方法の確立
  • キルン ショウセイ ノウリョク ゾウキョウ コウジ ト ソノ ソウギョウ ホウホウ ノ カクリツ

Search this article

Abstract

Iwakuni Mill and Otake Mill in Nippon Paper Industries are located adjacent to each other. They needed to reorganize the production structure of pulp and paper for the purpose of recovering profitability.<BR>As one of the measure of this, we tried to make Kraft Pulp more competitive by shutting down the production of pulp at Otake Mill permanently, consolidating their production into Iwakuni Mill.<BR>For this reason, it has become more important to produce pulp stably. To achieve this, there was priority issue―`insufficient capacity of recausticizing process' to be solved. Especially capacity of hot lime production in kiln was bottleneck in our recausticizing process when we make up enough white liquor for two digesters in full swing. To increase hot lime production, we have modified the process and optimized operating condition and utilized add―on chemical. And then we have finally achieved to produce sufficient white liquor and debottleneck Kraft Pulp production.

Journal

  • JAPAN TAPPI JOURNAL

    JAPAN TAPPI JOURNAL 68 (4), 385-388, 2014

    JAPAN TECHNICAL ASSOCIATION OF THE PULP AND PAPER INDUSTRY

Details 詳細情報について

Report a problem

Back to top