搾乳ユニット自動搬送システムの開発(第3報)―1,2号機の試作と模擬搾乳試験―

書誌事項

タイトル別名
  • Development of an Automatic System for Carrying Milking Units (Part 3)-Making First and Second Prototypes and Simulation Tests of Milking-
  • サクニュウ ユニット ジドウ ハンソウ システム ノ カイハツ ダイ3ポウ 1 2ゴウキ ノ シサク ト モギ サクニュウ シケン
  • Making First and Second Prototypes and Simulation Tests of Milking
  • 1, 2号機の試作と模擬搾乳試験

この論文をさがす

抄録

The first prototype was made in accordance with the design policy of this system described in the second report. This prototype was tested while performing automatic carrying more than 3, 000 times, and experienced a broken front axel, burned electric motor and a malfunction of the branch-point diverters. These problems were resolved in the second prototype and the pair milk tap coupler was changed to the one-motion type. Check functions were added for milk tap coupling and the automatic removal of the milking unit. Also, milking simulation tests were conducted at practical work routine intervals in this system. The vacuum drop in the 2-inch milking line didn't exceed 2kPa under conditions recommended in ISO5707.

収録刊行物

被引用文献 (1)*注記

もっと見る

参考文献 (3)*注記

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ