- 【Updated on May 12, 2025】 Integration of CiNii Dissertations and CiNii Books into CiNii Research
- Trial version of CiNii Research Automatic Translation feature is available on CiNii Labs
- Suspension and deletion of data provided by Nikkei BP
- Regarding the recording of “Research Data” and “Evidence Data”
-
- Ogawa N.
- (株)パシフィックコンサルタンツインターナショナル第一事業本部道路交通事業部
-
- Matsuzawa K.
- 日本工営(株)社会開発事業部交通技術部第2課
-
- Takeya K.
- (株)大林組東京本社土木本部海外土木部メグナ工事事務所
-
- Komai K.
- (株)大林組東京本社土木技術本部設計第三部設計課
Bibliographic Information
- Other Title
-
- バングラデシュ・メグナ橋の建設
- --Procurement of Material and Quality Control--
- --資材調達と品質管理について--
Description
This report describes the outline about the construction of Meghna Bridge, the elevenspan prestressed concrete (PC) continuous-hinged rigid frame bridge, constructed in Bangladesh. This bridge is located at the place, where the Dhaka-Chittagong highway intersects Meghna River, and it will be the longest road bridge in this country. This project is characterized by the construction of the big PC bridge in the developing country conducted by Official Development Assistance (ODA) of Japan. Therefore the quality control of the local procurement materials, especially materials used for concrete i.e. cement and aggregate etc, and the progress control of work under peculiar natural conditions, were important.
Journal
-
- Concrete Journal
-
Concrete Journal 29 (6), 46-55, 1991
Japan Concrete Institute
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390282680428851840
-
- NII Article ID
- 130004398297
-
- ISSN
- 03871061
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- Crossref
- CiNii Articles
-
- Abstract License Flag
- Disallowed